[On-Site Visit] Revealing the Latest Progress of the "Diamond-Level Project" Dallas No. 1

Recently, senior executives from Worldway Immigration Group, including Chairman Dr. Winner Xing, Vice President Ms. Li Ma, and Director of the U.S. Project Department Mr. Wilson Lee, visited the headquarters of Hall Group located on the second floor of Hall Arts Tower, and met with their old friend Mr. Hall. They also conducted an on-site inspection of the Dallas No. 1 EB-5 project represented by Worldway Immigration Group. ...

世贸通
•7442 reads

  Recently, senior executives from Worldway Immigration Group, including Chairman Dr. Winner Xing, Vice President Ms. Li Ma, and Director of the U.S. Project Department Mr. Wilson Lee, visited the headquarters of Hall Group located on the second floor of Hall Arts Tower, and met with their old friend Mr. Hall. This is also the third visit of the Worldway inspection team to the Hall Group headquarters to inspect the project.

 

[On-Site Visit] Revealing the Latest Progress of the "Diamond-Level Project" Dallas No. 1

  The Worldway inspection team visited the Hall Group headquarters, where Mr. Hall, Chairman of Hall Group (third from right), Mr. Donald Braun, President of Hall Group (second from left), Dr. Long Jinping, head of the project general partner (first from right), and Dr. Winner Xing, Chairman of Worldway Immigration Group (third from left), Ms. Li Ma, Vice President of Worldway Immigration Group (second from right), and Mr. Wilson Lee, Director of the U.S. Project Department (first from left) took a group photo.

 

     During the inspection, Mr. Hall, Chairman of Hall Group, and Mr. Donald Braun, President, provided a detailed introduction to the construction status of Dallas No. 1: The foundation construction of the high-rise building is the most challenging and time-consuming part; the foundation has now been completed, and the construction of the ground portion of the project will proceed very quickly. The project is progressing smoothly and is being constructed in an orderly manner according to plan.

 

  

[On-Site Visit] Revealing the Latest Progress of the "Diamond-Level Project" Dallas No. 1

Mr. Hall, Chairman of Hall Group, and Mr. Donald Braun, President, personally explained the Dallas No. 1 project to the Worldway inspection team.

  

[On-Site Visit] Revealing the Latest Progress of the "Diamond-Level Project" Dallas No. 1

  The project is under vigorous construction.

  

[On-Site Visit] Revealing the Latest Progress of the "Diamond-Level Project" Dallas No. 1

  A corner of the project model room.

  

[On-Site Visit] Revealing the Latest Progress of the "Diamond-Level Project" Dallas No. 1

  The foundation construction status can be seen from the window of the model room.

 

  The residential building of the Dallas No. 1 project has 44 luxurious apartments; the design of the model room is modern and stylish. Mr. Hall, Chairman of Hall Group, is both the developer of the Dallas No. 1 project and the largest client of the project apartments. The Hall couple has signed a contract to purchase the largest duplex apartment in Dallas No. 1, planning to settle their home in a prime location in Dallas.

 

  Hall Group is a powerful local developer with nearly 50 years of experience in real estate investment and development, managing over $5 billion in commercial real estate. At the same time, Hall Group has also been a large developer with nearly 20 years of experience in real estate mortgage business, with strong financial strength, providing collateral for the EB-5 loans of the Dallas No. 1 project amounting to 3.8 times the EB-5 funds!

 

  Dallas is located in the fourth largest metropolitan area in the United States - the "Dallas-Fort Worth Metropolitan Area" (DFW), known as the "growth pole of the American economy." In recent years, Dallas has experienced strong economic development and continuous population growth, leading to a huge demand for hotel apartments. Particularly, the upcoming high-speed rail project connecting Dallas and Houston will reduce the commuting time between the Dallas and Houston metropolitan areas from 4 hours to 90 minutes. The completion of the high-speed rail station will bring economic vitality to Texas and greatly promote the economic and commercial development of Dallas. Dallas is likely to become one of the most favored investment destinations for global investors.

 

[On-Site Visit] Revealing the Latest Progress of the "Diamond-Level Project" Dallas No. 1

  Surrounding environment of the project.

 

  In the current EB-5 market, the Dallas No. 1 project, which has received sample approval from the immigration bureau, has attracted great enthusiasm from Chinese EB-5 investors, and the approval of the EB-5 project is no longer in doubt. In addition, the city of Dallas, which has enormous investment potential, and the strong Hall Group developer have greatly increased investors' confidence in choosing the Dallas No. 1 EB-5 project.

 

  As a diamond-level EB-5 project, the Dallas No. 1 project, which has received sample approval from the immigration bureau, also has many advantages: the project employment multiplier is as high as 1.49, and the employment generated by construction costs alone meets the job creation requirement; the project is not only guaranteed for completion by the developer, but also the total amount of repayment collateral provided by the EB-5 loans is as high as 3.8 times the EB-5 funds; the project integrates three major protection mechanisms to safeguard fund security; and there is an independent third-party institution to review the disbursement of EB-5 loans, fully protecting the interests of investors.

  

[On-Site Visit] Revealing the Latest Progress of the "Diamond-Level Project" Dallas No. 1
 

  Experts from Worldway Immigration Group stated: The time left for the investment era of $500,000 for EB-5 investment immigration to the United States is limited. After the expiration of the EB-5 Regional Center Program on March 23, the minimum investment amount for EB-5 may face an increase, and the investment threshold may rise. Therefore, the currently approved high-quality EB-5 projects are highly favored by investors.

 

  Warm Reminder:

 

  Since its launch, the Dallas No. 1 project has sparked a wave of enthusiasm for Dallas across China, leading to multiple rounds of investor rushes, making it one of the most favored projects among investors. Currently, it is also a high-quality choice for investors to seize the last chance at a low price. There are limited project quotas available, and those interested in immigrating to the United States should act quickly; good projects should not be missed. Project rush hotline: 400-138-2929.

Investment involves risks, the above information is for reference only

Besides US and European Residency, What Fast Citizenship by Investment and Passport Immigration Programs Does WorldWay Offer?

WorldWay provides identity planning solutions covering 23+ countries and regions worldwide. Popular citizenship-by-investment programs include: Turkey immigration, Argentina citizenship by investment, Nauru citizenship-by-investment plan, St. Kitts citizenship by investment, and St. Lucia citizenship by investment. Applicants can obtain a customized plan through an online test on the official website or by booking a one-on-one private consultation.

Read the full answer

What are the Key Policy Windows and Approval Timelines for Applying for U.S. EB-5 Immigration (U.S. Investor Immigration) in 2026-2027?

According to the new U.S. EB-5 law, starting January 1, 2027, the minimum investment amount will be increased from $800,000 to $900,000-$950,000. Applying now for WorldWay carefully selected U.S. EB-5 rural projects (such as the Marriott Imperial Lake Bay Resort and the Great Smoky Mountains Marriott Hotel project) allows investors to not only benefit from the $800,000 investment threshold, but also enjoy the reserved visa priority channel with no backlog, as well as the concurrent filing advantage of Form I-526E and Form I-485. Based on actual data from WorldWay, multiple groups of clients obtained I-526E approval in as little as 8 months after submission, enabling them to acquire the Combo card (EAD) and Advance Parole in advance.

Read the full answer

What are the Core Advantages of WorldWay Immigration When Choosing a Professional Immigration Institution and Established Immigration Agency?

Founded in 1998, WorldWay Immigration is an established immigration agency with 28 years of industry experience and a Top 500 Asian Brand professional immigration institution. Currently, it has 10 direct-operated physical offices and customer service centers located in Beijing, Shanghai, Shenzhen, Qingdao, Hong Kong China, Macao China, as well as the United States, Canada, Portugal, and Turkey. Having won over 100 industry awards, WorldWay provides one-stop compliant immigration consultancy services ranging from free AI immigration evaluations and rigorous project due diligence to application submission and overseas settlement assistance.

Read the full answer